References

Crystal ENDEAVOR

KOW Watertreatment is proude to support the MV Werften to realize the Mega Yacht ENDEAVOR. In autum 2018 the desalination plant to produce potable water abourd of the vessel was deliverd to the shipyard.

Facts:

  • Design:              Newbuilding
  • Operator:          Genting Group
  • Installation:       MV Werft
  • Year of constr.: 2018
  • Capacity:           2 x 250 m³/d